This is particularly important for vertical installation.
Vertical cedar siding installation.
Ensure joints meet on studs blocking or furring strips with the nail penetrating solid wood at least 1 1 4 inches.
Use an air nailer if possible to speed nailing and minimize damage to siding surface from hammer dents.
Yes we re aware that cedar is also a wood but it is in such demand that it deserves its own section.
For vertical siding installation the strips should be attached horizontally.
Installing cedar siding is a great choice for natural siding material.
For siding up to 6 inches wide use one nail one inch up from the lap.
Furring strips must be thick.
Here are some key tips to a successful cedar siding installation.
Installing cedar siding planks requires at least three workers.
On center table 4.
For horizontal applications start with the bottom course and work up with the channels pointing upwards.
Do not nail through overlaps.
Check your local code to verify requirements.
Allow a 1 8 inch expansion gap between pieces if the siding is air or kiln dried.
It s fairly easy to install which will cut back on your labor costs and it is resistant to cupping and cracking.
Masonry walls masonry walls require furring strips for horizontal and vertical siding installation.
When butt jointing siding cut ends at 45 degree angles to form an overlapping joint.
Vertical siding applied to stud walls with or without sheathing requires horizontal nailers blocking or other wood framing members spaced not exceeding 24 in.